Eastcote's wide 1930s plots suit generous single storey rear extensions with roof lanterns, and detached houses on the Eastcote Park Estate often have room for a double storey side extension. Owners here usually want a large kitchen and dining space with doors onto the garden and a separate snug.

Typical extension projects in Eastcote

  • Rear extensions with roof lanterns and bifold or sliding doors
  • Double storey side extensions on detached Eastcote Park Estate homes
  • Matching tile hanging and brick on houses with original features

We work across Eastcote Village, Eastcote Park Estate, Eastcote Hill, Joel Street, Haydon Hall area and Field End Road. See our builders in Eastcote page or our main house extensions page for more.

Homes in Eastcote and what suits them

The Eastcote Park Estate and the roads off Field End Road are mostly 1930s semis and detached houses with generous gardens, many with tile hung bays and steep hipped roofs. Joel Street and the area towards Northwood Hills have more 1950s semis and short terraces. Around Eastcote Village there are older cottages and some substantial Edwardian houses that need a more careful approach.

House extensions and Hillingdon planning

Hillingdon assesses householder applications against its Local Plan and its residential extensions design guidance, which looks closely at depth, height and the effect on neighbours' light. A single storey rear extension of up to 3 metres on a semi or terrace, or 4 metres on a detached house, is often permitted development, and the prior approval route can allow up to 6 or 8 metres. Conservation areas and Areas of Special Local Character in the borough need more careful design and materials.

If you are unsure which route applies, read our guide to planning permission and permitted development.

What the work involves

An extension starts with a free survey, then drawings, structural calculations and either a planning application or a permitted development check. On site we set out and dig foundations, build the walls up to damp proof course, add the floor slab, then the walls, steel beams and roof. Once the building is watertight we break through into the house, fit windows and doors, and complete first fix electrics and plumbing, plastering, second fix and decoration. Building Control inspects at each key stage and issues a completion certificate at the end.

A typical single storey rear extension takes around 10 to 14 weeks on site, and a double storey extension around 14 to 20 weeks, after design and approvals are in place.

Throughout the build we keep the house secure and weathertight, protect floors and the garden, and clear the site regularly. You have one point of contact, and we talk through each stage before it starts so there are no surprises.

What affects the cost of a extension in Eastcote

The biggest factors are floor area, single or double storey, the type of roof, ground conditions and foundation depth, how much glazing you want, the number of steel beams needed to open up the back of the house, and the kitchen or bathroom that goes inside. Drainage running under the footprint, access for materials and party wall agreements also play a part. After our free survey we give you a clear written quote, itemised so you can see where the money goes.

For more detail, see what affects the cost of a house extension.

House extensions in nearby areas

Frequently asked questions

How do I match the tile hung bays on my Eastcote house?+

We source reclaimed or closely matching clay tiles and bricks so an extension blends with the original house, which also helps with planning.

Do I need to move out during an extension?+

Usually not. We build the new structure first while the house is closed off, and only break through near the end. There may be a few days without a kitchen, which we plan with you in advance.