Many home improvements can go ahead without a full planning application, thanks to permitted development rights. Knowing which route applies saves time and helps you plan a realistic design.

What permitted development means

Permitted development rights allow certain changes to houses without a planning application, within set limits. They apply to houses, not flats or maisonettes, and they can be removed by planning conditions or Article 4 directions. They are also reduced in conservation areas, National Landscapes and on listed buildings.

Common permitted development limits

In England, typical limits include:

  • Single storey rear extensions up to 3 metres on semis and terraces, or 4 metres on detached houses
  • Up to 6 or 8 metres through the prior approval process
  • Maximum height of 4 metres for single storey extensions
  • Loft additions up to 40 cubic metres on terraces and 50 on semis and detached houses
  • No roof additions on the slope facing the road
  • Materials similar in appearance to the existing house

When you need planning permission

Anything beyond these limits needs a householder planning application, as does most work in conservation areas that changes the outside, double storey extensions near boundaries, and anything on a flat or maisonette. Councils such as Hillingdon, Harrow, Three Rivers and Buckinghamshire assess applications against their own local policies and design guidance.

Lawful Development Certificates

Even if a project is permitted development, we recommend applying for a Lawful Development Certificate. It confirms the work is lawful, protects you if a neighbour complains, and is useful when you sell. It costs much less than a planning application and is usually decided in around eight weeks.

Building Regulations are separate

Whichever planning route applies, almost all extensions, loft conversions and garage conversions need Building Regulations approval. This covers structure, fire safety, insulation, ventilation and drainage. We arrange inspections throughout the build.

Local differences to be aware of

The national rules are the same everywhere in England, but local designations change how they apply. In Hillingdon, conservation areas such as Ruislip Village and Eastcote Village remove permitted development for roof extensions. Harrow uses Article 4 directions in several conservation areas around Pinner and Harrow on the Hill. In Buckinghamshire, the Chilterns National Landscape and Green Belt both affect what can be built. Three Rivers has conservation areas in Moor Park and Rickmansworth town centre. We check your address against these at our free survey, so you know which route applies before drawings are prepared.

Related services

Further reading

Frequently asked questions

How long does a planning application take?+

Householder applications usually take around eight weeks from validation, though some councils take longer.

Can I start work before planning permission is granted?+

It is not advisable. If permission is refused, you may have to undo the work.