Northolt's ex local authority houses and 1930s semis suit single storey rear extensions that turn a small kitchen into an open plan kitchen, dining and family room. Side extensions also work well on corner plots.
Typical extension projects in Northolt
- Rear kitchen extensions on ex local authority houses
- Side extensions on corner plots
- Open plan layouts for family living
We work across Northolt Village, West End Road, Ruislip Road, Wood End, Islip Manor and Yeading borders. See our builders in Northolt page or our main house extensions page for more.
Homes in Northolt and what suits them
Northolt's housing is mostly 1930s semis and terraces, post war council built houses and maisonettes, and newer developments near the A40. Many homes are ex local authority houses with good sized gardens, which extend well. Maisonettes are common in parts of the town.
House extensions and Ealing planning
Most of Northolt sits within the London Borough of Ealing, which assesses extensions against its Local Plan and residential extension guidance. Standard permitted development limits apply to houses, with up to 3 metres for semis and terraces and 4 metres for detached homes, and more through prior approval. Northolt Village has its own conservation area, where more care is needed with design and materials.
If you are unsure which route applies, read our guide to planning permission and permitted development.
What the work involves
An extension starts with a free survey, then drawings, structural calculations and either a planning application or a permitted development check. On site we set out and dig foundations, build the walls up to damp proof course, add the floor slab, then the walls, steel beams and roof. Once the building is watertight we break through into the house, fit windows and doors, and complete first fix electrics and plumbing, plastering, second fix and decoration. Building Control inspects at each key stage and issues a completion certificate at the end.
A typical single storey rear extension takes around 10 to 14 weeks on site, and a double storey extension around 14 to 20 weeks, after design and approvals are in place.
Throughout the build we keep the house secure and weathertight, protect floors and the garden, and clear the site regularly. You have one point of contact, and we talk through each stage before it starts so there are no surprises.
What affects the cost of a extension in Northolt
The biggest factors are floor area, single or double storey, the type of roof, ground conditions and foundation depth, how much glazing you want, the number of steel beams needed to open up the back of the house, and the kitchen or bathroom that goes inside. Drainage running under the footprint, access for materials and party wall agreements also play a part. After our free survey we give you a clear written quote, itemised so you can see where the money goes.
For more detail, see what affects the cost of a house extension.
House extensions in nearby areas
Frequently asked questions
Is Ealing's permitted development the same as elsewhere?+
The national rules are the same, but local conditions and conservation areas can change what applies to your house.
Do I need to move out during an extension?+
Usually not. We build the new structure first while the house is closed off, and only break through near the end. There may be a few days without a kitchen, which we plan with you in advance.