LandKBuilders
Modern fitted kitchen in a family home

Kitchen projects

Kitchen projects from layout changes and knock throughs to new kitchens in extensions, built by a family firm established in 1988.

Call 07850 623490

A new kitchen is often the reason people extend or refurbish. We handle the building work that makes a kitchen possible, from knocking through walls and adding steels to plumbing, electrics, plastering and fitting.

More than fitting units

Most of the kitchens we build involve changing the room itself. In a 1930s semi, that might mean removing the wall between the kitchen and dining room, adding a steel beam and moving the sink to a new island. In a Victorian terrace, it might mean filling the side return to widen a narrow galley. Because we carry out the structural work and the fit out, one team handles the whole job.

Kitchens in new extensions

When a kitchen moves into a new extension, its design affects the building itself: where drainage runs, where the steel beams go, the position of roof lanterns and doors, and whether underfloor heating is needed. Planning the kitchen alongside the extension drawings avoids compromises later. One of our featured projects is a bespoke kitchen with a curved marble island, built as part of an extension and loft conversion in Gerrards Cross.

What we take care of

A typical kitchen project with us includes:

  • Removing walls and installing steel beams with Building Control sign off
  • New drainage, water supplies and gas or induction cooking supplies
  • Rewiring, lighting design and extractor ducting
  • Plastering, flooring and underfloor heating
  • Fitting units, worktops and appliances

Planning your layout

Think about how you cook and live. Islands work best with enough space around them to open drawers and walk past. Utility rooms take laundry and noise out of the main space. Larder cupboards can replace wall units where you want the room to feel more open. We are happy to talk through ideas at our free survey and can work with your chosen kitchen supplier.

What affects the cost

The biggest factors are any structural work, how far the sink and appliances move from existing drainage, the units and worktops you choose, and the flooring. We quote in writing after a free survey, itemising the building work separately so you can compare kitchen suppliers easily.

Related services

Further reading

Frequently asked questions

Can you fit a kitchen I have bought from a supplier?+

Yes. We regularly fit kitchens from customers' chosen suppliers and handle all the building work around them.

How long will I be without a kitchen?+

For a refit in the same room, usually around 2 to 4 weeks. Where the kitchen goes into a new extension, the old kitchen often stays in use until near the end.

Call now