Building Regulations set minimum standards for safety, health and energy efficiency. They apply to most building work, whether or not planning permission is needed.
What they cover
The regulations are split into parts, including:
- Structure and foundations
- Fire safety and escape routes
- Ventilation and condensation
- Drainage
- Energy efficiency and insulation
- Electrical safety
How approval works
You can use the council's Building Control team or an approved private inspector. For larger projects, full plans are submitted and checked before work starts. For smaller jobs, a building notice may be used. Inspections take place at key stages, such as foundations, drainage and before plastering.
The completion certificate
When the work is finished and signed off, you receive a completion certificate. Keep it safe, as buyers' solicitors will ask for it when you sell. Without it, sales can be delayed.
Electrical and gas certificates
Electrical work is certified by a registered electrician, and gas work by a Gas Safe engineer. These certificates sit alongside the Building Control completion certificate.
How we handle it
We arrange Building Regulations approval and inspections as part of our service, and make sure you have every certificate at the end of the job.
Regularisation for older work
If work was carried out without approval in the past, the council may be able to issue a regularisation certificate after inspecting it. This sometimes means opening up parts of the work. It is worth sorting out before you sell, as buyers' solicitors will ask.
Building Regulations for different projects
For an extension, inspectors focus on foundations, drainage, structure, insulation and glazing. For a loft conversion, fire safety is especially important, with a protected escape route, fire doors and mains linked smoke alarms, as well as structure, insulation and stair design. For a garage conversion, the key points are foundations under the new wall, damp proofing, insulation and ventilation. Removing a load bearing wall needs structural calculations and approval. Many refurbishment tasks, such as rewiring, new heating systems or replacement windows, are covered by competent person schemes, which allow registered tradespeople to self certify their work.
Approved inspectors or council Building Control?
Both offer the same legal approval. Some homeowners prefer the local council, while others use a private approved inspector for flexibility. We can work with either.
Related services
Further reading
- Planning permission or permitted development?
- Party wall agreements explained
- Loft conversion types explained
Frequently asked questions
Do I need Building Regulations for a new kitchen?+
Replacing like for like usually does not, but new electrics, drainage or structural changes do.
What happens if work is not signed off?+
It can cause problems when you sell, and the council can require changes.
